Leisure Projects

« List

Fives Football Complex at Playsport

East Kilbride

Nord Architecture

_BCC project managed and coordinated every single element of this extremely complicated project from the very early design stages right through to the positioning of the last chair. The internal fit out consisted of a reception, kitchen, bar, cafe, toilets, changing rooms and offices and BCC coordinated all trades involved including IT, audio & visual, lift installations, etc. The fit out was further complicated by the installation of a climbing wall which BCC, in conjunction with Rockworks Ltd and the Client, designed to provide various types of climbing activities for all abilities within a relatively small area.

BCC also tendered the synthetic 5 and 7-a-side football pitches and managed the successful contractor through to completion. Utilising the latest in turf technology BCC have designed a high specification playing surface incorporating the latest shock pad system to ensure the surface replicates the pace and safety of natural grass. The turf avoids excess rubber typically associated with 3G pitches. The rebound boards have been replaced with a new fencing system designed to improve football skill levels. Whilst the fencing is designed for ball rebound, the open nature of the fencing invites the players to play a more natural game at a higher skill level.

_BCC were also the quantity surveyors on the project carrying out valuations for every contractor and submitting bank reports for the drawdown of funds every month.